|
Circular No.
|
Date
|
Subject
|
|
Track
|
|
107
|
10/06/2022
|
Ensuring quality of work and maintaining site records in works contracts
|
|
Withdrawal of CE circular 98
|
08/06/2022
|
Withdrawal of CE circular 98
|
|
106
|
11/04/2022
|
Safety of Track
|
|
100
|
22/04/2019
|
Guidelines for Cess Repair and Cess widening Work
|
|
98 (Revision-I)
|
19/02/2014
|
(A)Prevention of asset failures by rationalization of frequency of lubrication and inspection.
|
|
99
|
24/09/2013
|
Minimum Inspection Schedule of P.Way Officials
|
|
CE''s Circular No. 98
|
15/11/2010
|
Prevention of asset failures & Measurement of corrosion of rail foot due to linner biting
|
|
97
|
07/05/2010
|
Replacement of corroded steel channel sleepers
|
|
96
|
18/09/2009
|
Laying & Maintenance of CMS Crossings
|
|
95
|
04/04/2006
|
Joint Sleepers
|
|
93
|
08/02/2006
|
Competency Certificate- Permit to work
|
|
94
|
25/01/2006
|
Ballast procurement and its utilization
|
|
92
|
13/07/2005
|
Quality Control of Track renewwal and other work
|
|
91
|
23/03/2005
|
Fabrication, Erection, Painting,Inspection & Maintance of Steel Channel Sleepers.
|
|
90
|
24/01/2005
|
Essential Tools & Fittings to be kept by Keyman Mate & Gateman under his custody.
|
|
89
|
12/10/2004
|
Cocmsete Sleepers Track- Maintenance program.
|
|
88
|
09/02/2004
|
Summer Precaution on Track
|
|
87
|
05/09/2002
|
Precutions when view is obstructed at the site of maintenance work
|
|
86
|
06/08/2002
|
Maintenance of loop lines and overshoots in yards wherever speed been icmseased to 30 kmph
|
|
85
|
13/02/2002
|
Execution of end croping and welding of Rails
|
|
84
|
20/02/2001
|
Project Report for Track Renewal Works.
|
|
83
|
19/02/2001
|
Matallurgical investigation of rail-test pieces in case of rail failure/visual or Ultrasonic detection of rail flaw.
|
|
82
|
19/04/2000
|
Summer Prections-P.Way.
|
|
81
|
03/02/2000
|
Provision of flats on check rails of Diamonds
|
|
80
|
17/12/1999
|
Rail Fractures, Winter Precaution.
|
|
78
|
15/12/1993
|
Manual laying of pre- stressed Cocmsete Sleepers.
|
|
77
|
08/02/1993
|
Analysis of record of OMS-2000Run by PWI,AEN & DEN and documentation of results.
|
|
76
|
15/05/1991
|
Joint Traffic and Engineering circular for traffic blocks for Engineering works.
|
|
75
|
20/02/1991
|
Stretches of Track under machine maintenance.
|
|
74
|
30/01/1991
|
Working of Track Machines on NE Railway-(Divisional/Headquarter Control)
|
|
73
|
28/04/1989
|
Supply of Ballast/Boulders.
|
|
71
|
01/11/1988
|
Maintenance of Level Crossing
|
|
70
|
18/05/1982
|
Extensive casual renewals of unservicable wooden sleeper
|
|
69
|
17/02/1982
|
Ultrasonic Flaw Detection of Rails
|
|
Amedement to CE circular 35
|
11/01/1982
|
Speed Restriction for Track works
|
|
68
|
12/01/1981
|
Inspection of Points & Crossing By Signal & Engineering Inspectors
|
|
67
|
07/01/1980
|
Use of 2 Block RCC Sleepers (MG) In The Yards
|
|
66
|
08/03/1978
|
Directed Track Maintenance
|
|
65
|
10/11/1976
|
Level crossing and check rails
|
|
64
|
31/12/1973
|
Marking of Rail level
|
|
63
|
12/04/1972
|
Ballast requirement
|
|
62
|
15/03/1972
|
Accontial of Materials in the custody of PWI
|
|
61
|
14/02/1972
|
Lubrication of rails
|
|
60
|
06/01/1972
|
Use of M.S liners
|
|
59
|
08/01/1970
|
Corresion of rails
|
|
58
|
05/09/1969
|
Maintenance of level Crossings.
|
|
57
|
22/08/1969
|
Ramming of cribs and shoulders after packing and alignment correction
|
|
56
|
07/03/1969
|
Maintenance of Sand Humps
|
|
55
|
04/02/1969
|
Attention to rail in the vicinity of water column
|
|
54
|
08/01/1969
|
Cleaning of new Rails
|
|
53
|
03/01/1968
|
Long Welded Rails
|
|
52
|
19/04/1966
|
Resurfacing of Points & Crossing by Gas Welding " IN SITU"
|
|
51
|
10/03/1966
|
Recording and Checking of Gang work
|
|
Amedement to CE circular 48
|
09/02/1966
|
Casual renewals of wooden Track sleepers
|
|
48
|
04/01/1966
|
Casual renewals of wooden Track sleepers
|
|
2
|
01/01/1966
|
Diversion of Level Crossing with Extending Loops in the Station Yards
|
|
49
|
06/05/1965
|
Standard Ballast section & Formation width
|
|
47
|
07/04/1965
|
Curve Reagister and realingment of curve
|
|
46
|
17/03/1965
|
Track maintenance.
|
|
44
|
02/02/1965
|
Preventation of adjustment of creep
|
|
43
|
05/01/1965
|
Use of non- removeable Keys with Two Key-Type A.C.B plates and Steel Trough Sleepers
|
|
40
|
20/02/1964
|
Road Test
|
|
37
|
06/01/1964
|
P way inspection Note book
|
|
35
|
13/03/1963
|
Relaying of Track
|
|
33
|
07/01/1963
|
Records of materials under trial
|
|
31
|
20/03/1962
|
Maintenance of Points & Crossings.
|
|
27
|
09/03/1962
|
Loading of clams for missing consignments
|
|
26
|
06/02/1962
|
Accidents at Level Crossing
|
|
24
|
09/01/1962
|
Memos to be given to Station Masters while Trolly, Motor Trolly, Lorry working without line clear
|
|
22
|
04/07/1961
|
Scrutiny of P.Way Materials Recived from Firms and acceptatance of the materials
|
|
21
|
21/06/1961
|
Provision of Dogs Spikes in Track
|
|
20
|
12/06/1961
|
Inspection & Maintenance of Points & Crossings.
|
|
19
|
09/05/1961
|
Working of Level Crossing outside Station
|
|
18
|
04/04/1961
|
Bearing Plates.
|
|
17
|
03/03/1961
|
Prize distribution for best maintained Gang- Length & best maintained PWI''s- Length.
|
|
7
|
01/02/1961
|
Scotch Blocks
|
|
3
|
02/01/1961
|
Use of wooden sleepers in Level Crossing & approaches to Bridges on Metal sleepered sections
|
|
1
|
01/01/1960
|
Maintenance of Catch & Slip Sidings
|
|
4
|
01/01/1959
|
Accident - Holding down bolts
|
|
6
|
06/01/1958
|
All Concered Messages
|
|
15
|
01/01/1957
|
Opening of new lines in Station Yards etc.
|
|
Track Machine
|
|
79
|
6-1-1994
|
Inspection schedule for track Machine
|
|
105
|
08.04.2022
|
Pre-requisites for deployment of Track Machines (Trampers) on Construction project/other agencies
|
|
Bridges
|
|
1
|
02.06.1988
|
Inspection of Important Bridges
|
|
2
|
15.09.1988
|
Classification & Inspection of Distressed Bridges
|
|
3
|
28.12.1988
|
Procedure for monitoring compliance of Inspection notes recorded in Bridge Register
|
|
4
|
07.02.1989
|
Bridge Inspection Schedule
|
|
6
|
27.04.1989
|
Fixing of Danger Level on Bridges
|
|
7
|
02.06.1989
|
Minimum opening and stranded spans of new Bridges
|
|
8
|
14.09.1989
|
Development of proposals for Rebuilding/Rehabilitation of Bridge
|
|
9
|
10.01.1990
|
Assistance to the bridge inspectors by Divison regarding duties & responsibility and also assistance for painting & greasing of grider bridges upto 12.20 m spans
|
|
10
|
13.02.1990
|
Afflux - Measurement
|
|
2R(1990)
|
18.04.1990
|
Distressed bridges - Classification
|
|
4R(1990)
|
18.04.1990
|
Bridge Inspection Schedule
|
|
11
|
17.01.1991
|
Provision of height gauges at the approaches of the road – under – bridge/Subway
|
|
12
|
22.06.1995
|
Erection of steel structures
|
|
13
|
25.01.1996
|
Inspection & Maintenance of Bridges
|
|
14
|
18.12.2000
|
Handing over of section from Construction Organization to open-line after construction of new line & gauge conversion
|
|
15
|
15.07.2014
|
Temporary speed restriction in connection with Bridge work
|
|
16
|
12.11.2014
|
Inspection of road over bridges
|
|
Works
|
|
72
|
1980
|
Arbitration demand-Processing
|
|
101
|
29.01.2020
|
System improvement to prevent contract variations
|
|
102
|
08.10.2021
|
Inspection & Maintenance of Buildings, Staff Quarters and other Structures
|
|
Land
|
|
103
|
22.03.2022
|
Guidelines for approval of Engineering Drawings
|
|
104
|
22.03.2022
|
Guidelines for Construction of Boundary Wall on Railway Land
|
|
Other Important Instruction
|
|
w/275/o/A/Gen/Pt-VIII/4A
|
25/09/2023
|
Winter precaution to prevent rail / weld failure- Safety of Track
|
|
W/26/0/Ballast Policy/Pt-II/4A
|
30/08/2023
|
NER Joint Procedure Order for unloading of ballast DMT
|
|
JPO N/563/2/10/(B) pt I
|
23/08/2022
|
JPO no. 1/2022(Signal) for inspection of Glued Joints
|
|
W/275/A/Track Policy/Pt-IX/4A
|
08/02/2022
|
Maintenance of Track on Ballasted Track Bridges & Approaches (Deep Screening)
|
|
W/275/A/Track Policy/Pt-IX/4A
|
08/02/2022
|
JPO for providing Safety gadgets for working in electrified territory at Engg LC gates
|
|
W/29/0/Bridge Policy/5
|
07/02/2022
|
Irrigation drains across Railway Track
|
|
W/29/0/A/Pt.IV/5
|
10/01/2022
|
Provision of cover plates over cross girders of OWG
|
|
W/29/0/Bridge Policy/5
|
29/10/2021
|
Pipe line crossing/Irrigation drains-classification, maintenance & their extension
|
|
DO No W/26/0/Ballast Policy/Pt-II/W-4A
|
16/10/2020
|
Unloading of Ballast DMT
|
|
SWR
|
16/11/2017
|
Guideline for BOBYN unloading
|