Circular No. | Date | Subject |
Track |
107 | 10/06/2022 | Ensuring quality of work and maintaining site records in works contracts |
Withdrawal of CE circular 98 | 08/06/2022 | Withdrawal of CE circular 98 |
106 | 11/04/2022 | Safety of Track |
100 | 22/04/2019 | Guidelines for Cess Repair and Cess widening Work |
98 (Revision-I) | 19/02/2014 | (A)Prevention of asset failures by rationalization of frequency of lubrication and inspection. |
99 | 24/09/2013 | Minimum Inspection Schedule of P.Way Officials |
CE''s Circular No. 98 | 15/11/2010 | Prevention of asset failures & Measurement of corrosion of rail foot due to linner biting |
97 | 07/05/2010 | Replacement of corroded steel channel sleepers |
96 | 18/09/2009 | Laying & Maintenance of CMS Crossings |
95 | 04/04/2006 | Joint Sleepers |
93 | 08/02/2006 | Competency Certificate- Permit to work |
94 | 25/01/2006 | Ballast procurement and its utilization |
92 | 13/07/2005 | Quality Control of Track renewwal and other work |
91 | 23/03/2005 | Fabrication, Erection, Painting,Inspection & Maintance of Steel Channel Sleepers. |
90 | 24/01/2005 | Essential Tools & Fittings to be kept by Keyman Mate & Gateman under his custody. |
89 | 12/10/2004 | Concrete Sleepers Track- Maintenance program. |
88 | 09/02/2004 | Summer Precaution on Track |
87 | 05/09/2002 | Precutions when view is obstructed at the site of maintenance work |
86 | 06/08/2002 | Maintenance of loop lines and overshoots in yards wherever speed been increased to 30 kmph |
85 | 13/02/2002 | Execution of end croping and welding of Rails |
84 | 20/02/2001 | Project Report for Track Renewal Works. |
83 | 19/02/2001 | Matallurgical investigation of rail-test pieces in case of rail failure/visual or Ultrasonic detection of rail flaw. |
82 | 19/04/2000 | Summer Prections-P.Way. |
81 | 03/02/2000 | Provision of flats on check rails of Diamonds |
80 | 17/12/1999 | Rail Fractures, Winter Precaution. |
78 | 15/12/1993 | Manual laying of pre- stressed Concrete Sleepers. |
77 | 08/02/1993 | Analysis of record of OMS-2000Run by PWI,AEN & DEN and documentation of results. |
76 | 15/05/1991 | Joint Traffic and Engineering circular for traffic blocks for Engineering works. |
75 | 20/02/1991 | Stretches of Track under machine maintenance. |
74 | 30/01/1991 | Working of Track Machines on NE Railway-(Divisional/Headquarter Control) |
73 | 28/04/1989 | Supply of Ballast/Boulders. |
71 | 01/11/1988 | Maintenance of Level Crossing |
70 | 18/05/1982 | Extensive casual renewals of unservicable wooden sleeper |
69 | 17/02/1982 | Ultrasonic Flaw Detection of Rails |
Amedement to CE circular 35 | 11/01/1982 | Speed Restriction for Track works |
68 | 12/01/1981 | Inspection of Points & Crossing By Signal & Engineering Inspectors |
67 | 07/01/1980 | Use of 2 Block RCC Sleepers (MG) In The Yards |
66 | 08/03/1978 | Directed Track Maintenance |
65 | 10/11/1976 | Level crossing and check rails |
64 | 31/12/1973 | Marking of Rail level |
63 | 12/04/1972 | Ballast requirement |
62 | 15/03/1972 | Accontial of Materials in the custody of PWI |
61 | 14/02/1972 | Lubrication of rails |
60 | 06/01/1972 | Use of M.S liners |
59 | 08/01/1970 | Corresion of rails |
58 | 05/09/1969 | Maintenance of level Crossings. |
57 | 22/08/1969 | Ramming of cribs and shoulders after packing and alignment correction |
56 | 07/03/1969 | Maintenance of Sand Humps |
55 | 04/02/1969 | Attention to rail in the vicinity of water column |
54 | 08/01/1969 | Cleaning of new Rails |
53 | 03/01/1968 | Long Welded Rails |
52 | 19/04/1966 | Resurfacing of Points & Crossing by Gas Welding " IN SITU" |
51 | 10/03/1966 | Recording and Checking of Gang work |
Amedement to CE circular 48 | 09/02/1966 | Casual renewals of wooden Track sleepers |
48 | 04/01/1966 | Casual renewals of wooden Track sleepers |
2 | 01/01/1966 | Diversion of Level Crossing with Extending Loops in the Station Yards |
49 | 06/05/1965 | Standard Ballast section & Formation width |
47 | 07/04/1965 | Curve Reagister and realingment of curve |
46 | 17/03/1965 | Track maintenance. |
44 | 02/02/1965 | Preventation of adjustment of creep |
43 | 05/01/1965 | Use of non- removeable Keys with Two Key-Type A.C.B plates and Steel Trough Sleepers |
40 | 20/02/1964 | Road Test |
37 | 06/01/1964 | P way inspection Note book |
35 | 13/03/1963 | Relaying of Track |
33 | 07/01/1963 | Records of materials under trial |
31 | 20/03/1962 | Maintenance of Points & Crossings. |
27 | 09/03/1962 | Loading of clams for missing consignments |
26 | 06/02/1962 | Accidents at Level Crossing |
24 | 09/01/1962 | Memos to be given to Station Masters while Trolly, Motor Trolly, Lorry working without line clear |
22 | 04/07/1961 | Scrutiny of P.Way Materials Recived from Firms and acceptatance of the materials |
21 | 21/06/1961 | Provision of Dogs Spikes in Track |
20 | 12/06/1961 | Inspection & Maintenance of Points & Crossings. |
19 | 09/05/1961 | Working of Level Crossing outside Station |
18 | 04/04/1961 | Bearing Plates. |
17 | 03/03/1961 | Prize distribution for best maintained Gang- Length & best maintained PWI''s- Length. |
7 | 01/02/1961 | Scotch Blocks |
3 | 02/01/1961 | Use of wooden sleepers in Level Crossing & approaches to Bridges on Metal sleepered sections |
1 | 01/01/1960 | Maintenance of Catch & Slip Sidings |
4 | 01/01/1959 | Accident - Holding down bolts |
6 | 06/01/1958 | All Concered Messages |
15 | 01/01/1957 | Opening of new lines in Station Yards etc. |
Track Machine |
79 | 6-1-1994 | Inspection schedule for track Machine |
105 | 08.04.2022 | Pre-requisites for deployment of Track Machines (Trampers) on Construction project/other agencies |
Bridges |
1 | 02.06.1988 | Inspection of Important Bridges |
2 | 15.09.1988 | Classification & Inspection of Distressed Bridges |
3 | 28.12.1988 | Procedure for monitoring compliance of Inspection notes recorded in Bridge Register |
4 | 07.02.1989 | Bridge Inspection Schedule |
6 | 27.04.1989 | Fixing of Danger Level on Bridges |
7 | 02.06.1989 | Minimum opening and stranded spans of new Bridges |
8 | 14.09.1989 | Development of proposals for Rebuilding/Rehabilitation of Bridge |
9 | 10.01.1990 | Assistance to the bridge inspectors by Divison regarding duties & responsibility and also assistance for painting & greasing of grider bridges upto 12.20 m spans |
10 | 13.02.1990 | Afflux - Measurement |
2R(1990) | 18.04.1990 | Distressed bridges - Classification |
4R(1990) | 18.04.1990 | Bridge Inspection Schedule |
11 | 17.01.1991 | Provision of height gauges at the approaches of the road – under – bridge/Subway |
12 | 22.06.1995 | Erection of steel structures |
13 | 25.01.1996 | Inspection & Maintenance of Bridges |
14 | 18.12.2000 | Handing over of section from Construction Organization to open-line after construction of new line & gauge conversion |
15 | 15.07.2014 | Temporary speed restriction in connection with Bridge work |
16 | 12.11.2014 | Inspection of road over bridges |
Works |
72 | 1980 | Arbitration demand-Processing |
101 | 29.01.2020 | System improvement to prevent contract variations |
102 | 08.10.2021 | Inspection & Maintenance of Buildings, Staff Quarters and other Structures |
Land |
103 | 22.03.2022 | Guidelines for approval of Engineering Drawings |
104 | 22.03.2022 | Guidelines for Construction of Boundary Wall on Railway Land |
Other Important Instruction |
w/275/o/A/Gen/Pt-VIII/4A | 25/09/2023 | Winter precaution to prevent rail / weld failure- Safety of Track |
W/26/0/Ballast Policy/Pt-II/4A | 30/08/2023 | NER Joint Procedure Order for unloading of ballast DMT |
JPO N/563/2/10/(B) pt I | 23/08/2022 | JPO no. 1/2022(Signal) for inspection of Glued Joints |
W/275/A/Track Policy/Pt-IX/4A | 08/02/2022 | Maintenance of Track on Ballasted Track Bridges & Approaches (Deep Screening) |
W/275/A/Track Policy/Pt-IX/4A | 08/02/2022 | JPO for providing Safety gadgets for working in electrified territory at Engg LC gates |
W/29/0/Bridge Policy/5 | 07/02/2022 | Irrigation drains across Railway Track |
W/29/0/A/Pt.IV/5 | 10/01/2022 | Provision of cover plates over cross girders of OWG |
W/29/0/Bridge Policy/5 | 29/10/2021 | Pipe line crossing/Irrigation drains-classification, maintenance & their extension |
DO No W/26/0/Ballast Policy/Pt-II/W-4A | 16/10/2020 | Unloading of Ballast DMT |
SWR | 16/11/2017 | Guideline for BOBYN unloading |