|
Man Power Planning
|
|
Post Date
|
Subjects
|
Link
|
|
2025-26
|
|
16.10.2025
|
11 posts Re-distribution of Electrical (Opr.) Department
|
Download
|
|
14.10.2025
|
Memo of 04 posts surrender of Commercial Department against Rationalization of Man Power(Reduction of Man power include Work Study)
|
Download
|
|
09.06.2025
|
01 post Re-distribution of Personnel Department
|
Download
|
|
09.06.2025
|
04 posts Re-distribution of Engineering Department
|
Download
|
|
2024-25
|
|
23.01.2025
|
23 posts Re-distribution of Electrical (TRS) Department
|
Download
|
|
09.01.2025
|
74 posts Re-distribution of Engineering Department
|
Download
|
|
17.12.2024
|
42 posts Re-distribution of Mechanical(C&W) Department
|
Download
|
|
14.10.2024
|
83 posts Re-distribution of Engineering Department
|
Download
|
|
18.07.2024
|
938 posts Merge CC/TC/ECRC/CI of Commercial Department
|
Download
|
|
08.04.2024
|
19 posts Re-distribution of Operating Department
|
Download
|
|
2023-24
|
|
22.03.24
|
Memo of 12 posts surrender of Commercial Department against Rationalization of Man Power(Reduction of Man power include Work Study)
|
Download
|
|
30.01.24
|
Memo of 12 posts surrender of Commercial Department against Rationalization of Man Power(Reduction of Man power include Work Study)
|
Download
|
|
26.12.23
|
Memo of 145 posts increase against Crew review of running cadre in Electrical (Operation) Department(Total posts after review is 1544)
|
Download
|
|
16.10.23
|
Memo of 51 posts surrender of Engineering Department against Rationalization of Man Power(Reduction of Man power include Work Study)
|
Download
|
|
16.10.23
|
Memo of 03 posts surrender of Operating Department against Rationalization of Man Power(Reduction of Man power)
|
Download
|
|
16.10.23
|
Memo of 10 posts surrender of Signal & Tele Department against Rationalization of Man Power(Reduction of Man power)
|
Download
|
|
16.10.23
|
Memo of 02 posts surrender of Personnel+Admin Department against Rationalization of Man Power(Reduction of Man power)
|
Download
|
|
13.09.23
|
Memo of 16 posts surrender of Mech (C&W) Deptt. against Rationalization of Man Power(Reduction of Man power)
|
Download
|
|
05.07.23
|
Memo of 21 posts Re-distributed
|
Download
|
|
10.05.23
|
Memo of 01 Chief controller/L-7 post permanently transfer to Railway Board
|
Download
|
|
2022-23
|
|
15.03.23
|
Memo of 72 posts surrender against Rationalization of Man Power/2% surrender target
|
Download
|
|
16.03.23
|
Memo of 71 posts surrender against post Up-gradation from Level-7 to Level-8
|
Download
|
|
06.10.22
|
Memo of 145 posts surrender against Rationalization of Man Power/2% surrender target
|
Download
|
|
2021-22
|
|
31.03.22
|
11 Clerical cadre posts surrendered in Engineering, Commercial, Operating & Mechanical(O&F) Deptt.
|
Download
|
|
30.03.22
|
01 post surrendered in Personnel+Admin Department
|
Download
|
|
30.03.22
|
10 posts surrendered in S&T Department
|
Download
|
|
30.03.22
|
10 posts surrendered in Electrical(G) Department
|
Download
|
|
30.03.22
|
25 posts surrendered in Engineering Department
|
Download
|
|
30.03.22
|
34 posts surrendered in Operating Department
|
Download
|
|
30.03.22
|
11 posts surrendered in Mechanical(C&W) Department
|
Download
|
|
30.03.22
|
05 posts surrendered in Mechanical(O&F) Department
|
Download
|
|
30.03.22
|
09 posts surrendered in Commercial Department
|
Download
|
|
16.03.22
|
12 posts surrendered against work Study in Commercial Department
|
Download
|
|
16.03.22
|
20 posts surrendered against work Study in Medical Department
|
Download
|
|
25.01.22
|
11 Posts surrendered in Mechanical(O&F) Department
|
Download
|
|
02.01.22
|
1399 posts sanction for Running cadre in Mechanical (O&F) Department
|
Download
|
|
2020-21
|
|
02.11.20
|
29 posts created against 48 posts surrender in Engineering Department
|
Download
|
|
21.09.20
|
04 posts surrendered in Mechanical(O&F) deptt.
|
Download
|
|
18.09.20
|
24 posts surrendered in Medical Deptt. (06 posts surrender in favour of work study No-09/2017-18 out of 24)
|
Download
|
|
14.09.20
|
06 posts surrendered of Admin Deptt. in favour of Work Study No.-08/2017-18
|
Download
|
|
25.08.20
|
84 posts surrendered of 50% vacancy in Non-Safety categories
|
Download
|
|
18.08.20
|
39 posts created in Mechanical(C&W)
|
Download
|
|
05.06.20
|
03 posts surrendered in Mechanical(O&F)
|
Download
|
|
12.05.20
|
161 posts created in Engineering
|
Download
|
|
2019-2020
|
|
14.01.19
|
254 posts surrendered in Engg. Deptt
|
Download
|
|
26.11.19
|
04 posts surrendered in Mech(O&F) Deptt.
|
Download
|
|
17.10.19
|
729 posts temp. to Permanent posts and extension period for 154 posts of Engg Deptt.
|
Download
|
|
09.07.19
|
31 posts creation in 1:1 of S&T Deptt.
|
Download
|
|
25.06.19
|
173 posts temp. to Permanent posts and extension period for 59 posts of Optg Deptt.
|
Download
|
|
12.06.19
|
19 posts temp. to Permanent posts of Medical Deptt.
|
Download
|
|
27.05.19
|
12 posts temp. to Permanent posts and extension period for 07 posts of Personnel Deptt.
|
Download
|
|
27.05.19
|
28 posts temp. to Permanent posts of Comm. Deptt.
|
Download
|
|
13.05.19
|
177 posts temp. to Permanent posts and extension period for 120 posts of Elect(TRD)Deptt.
|
Download
|
|
13.05.19
|
109 posts temp. to permanent posts of Elect.(G) Deptt.
|
Download
|
|
13.05.19
|
247 posts temp. to Permanent posts and extension period for 93 posts of S&T Deptt.
|
Download
|
|
06.05.19
|
73 posts creation
|
Download
|